Installation Environmental Conditions
Installation Environmental Conditions
Install the LightStream 100 ATM switch in an area that meets the following conditions:
1Make sure the LightStream 100 switch remains operational within the temperature and humidity limits shown in Table
2Allow the following minimum vacant space surrounding the LightStream 100 switch to ensure proper heat radiation:
—10 cm (approximately 4 inches) or
—10 cm (approximately 4 inches) or
—10 cm (approximately 4 inches) or
3Make sure the installation site meets the following criteria:
—Protected from water and chemicals
—Free of shock and vibration
—Horizontal
—Free of excessive dust
—Away from direct sunlight
—Away from devices that generate strong magnetism (for example, a TV or speakers)
Confirming the Contents of the Shipping Container
This section provides information about the contents of containers used to transport the LightStream 100 ATM switch.
The LightStream 100 switch comes in two containers: the LightStream 100 main unit container and the LINF card container. Ensure that the containers are labeled with each type of equipment before opening them.
The LightStream 100 main unit includes the following parts:
•
•
Motherboard
Bus converter (BCONV) card