MOVING UNIT
1. While still on skid, move unit as close to final
installation position as possible.
2. Prepare unit for lifting as shown in diagram.
3. Lift gently with a forklift or jacks and remove
skid.
4. Lower gently to ground and remove forklift
and blocking.
5. If unit has to be re-positioned, slide gently. Do
not twist or push one side of unit excessively
and cause binding on trunnions.
Shim as
required
to make
level with
center
console
(front
and back)
4"x4" or larger
(front and back)
Forklift tongsSkid Flanged feet
Jack
LEVELING
Recommended Leveling Procedure
1. With straight-edge, line the backs of the
consoles up with each other (dotted line A)
.
2.
Level and straight-edge backs of consoles
(dotted
line B)
. Adjustments are made by turning flanges
on back feet only.
3.
Level consoles individually from front to back
(dotted lines C). Adjustments are made by turning
flanges on front feet only.
4. Re-check that the back is level (dotted line B)
and then the front (dotted line D). Adjust if
necessary.
5. Check that mixer bridge is level and
guide pins lock smoothly without
binding. If not repeat steps 1through 4.
Guide Pins
NOTE: See Operating Instructions before
operating unit.
6. Make electrical connections (see electrical
service connections) and test mixer bridge as
follows:
A/ Raise mixer bridge.
B/ Swing bridge out over centre console.
C/ Swing bridge to the left as far as possible.
B
A
C
D
B
A
C
D
C
C
C
C
Recommended Installation Procedure
Note: Instructions reflect a more complicated twin mixer kettle - process for single mixer kettles is the same.