
Inflation/Deflation Instructions
1. Position Airbed
–Unroll and layout airbed in position.
–Close secondary valve as shown in Double LockTM Valve Operation.
Control dial in
OFF position
Double LockTM Valve
Operation
2. Inflate Airbed
–Connect pump to power source.
–Turn control dial to INFLATE and begin inflation. When bed is fully inflated, turn dial to OFF position
To adjust firmness briefly turn control dial: DEFLATE decreases firmness
INFLATE increases firmness
Turn Control dial to
INFLATE position
3. Deflate Airbed
–Turn the control dial to DEFLATE.
–For storage, fold the bed and roll it up to store in carry bag.
Turn Control dial to
DEFLATE position