INSTALLATION INSTRUCTIONS
IMPORTANT : READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN FOR FUTURE REFERENCE
EPL Envoy
Task Light Field Installation Kit
Sheet 2 of 3
4/7/08IMI-695D
LUMINAIRE RE-INSTALLATION:
1.Note: Install lens to housing if removed during drilling. Reverse Step 3.
2.Secure hanging hook into the rear hooks of quick mount plate (Figure 3 & 4).
3.Make wiring connection while luminaire is being suspended from hanging hook.
4.Push excess wires and connectors up into the junction box.
5.Lift up luminaire onto the (4) four hooks of quick mount plate while guiding the wires through center access hole (Figure 3).
6.Push luminaire forward for engagement. When it reaches the
CAUTION: If full engagement is not reached, it is not yet rigidly installed.
Figure 4
QUICK MOUNT
PLATE
REAR HOOKS | FRONT HOOKS |
| |
LUMINAIRE | CENTER ACCESS HOLE |
HANGING HOOK |
|
Figure 5
LATCH
RETAINER
SCREW
Figure 6
UPPER
REFLECTOR
THUMB
SCREW
These instructions do not claim to cover all details or variations in the equipment, procedure, or process described, nor to provide directions for meeting every possible contingency during installation, operation or maintenance. When additional information is desired to satisfy a problem not covered sufficiently for user’s purpose, please contact your nearest representative.
NOTE: Specifications and dimensions subject to change without notice.
Customer First Center 1121 Highway 74 South Peachtree City, GA 30269 770.486.4800 FAX 770.486.4801 ADH080775