age panel to the cabinet. The panel can now be pulled down to provide access for routing the pressure switch wires. Secure the wiring with the plastic cable ties provided in the kit to avoid “pinching” (cutting) the wire insulation when the panels are assembled to the cabinet.
7.Connect electrical power to the unit. Before opening the water and CO2 supply valves to the beverage system, verify that the CO2 indicator light is on. The indicator light should go off when the CO2 supply valve is opened.
8.Check for proper operation of the ice portion control system and the beverage system. Refer to the operation instructional label located on the upper front panel and the owners manual. The unit is now ready for operation.
Beverage Valve | |
& Auto/Manual | |
BEVERAGE VALVE | & AUTO/MANUAL |
| HARNESS FROM |
Harness From | |
| |
CO2 Inlet Line | |
| CO2 INLET |
| LINE TO REGULATOR |
| To Regulator |
| CO2 Supply Line |
| CO2 SUPPLY |
| To CarbonatorLINE TO Tank |
| C A R B O N A T O R T A N K |
Figure 1.
Manual Ice
Dispense PB
MANUAL ICE
SwitchDISPENSE PB Cord
S W I T C H C O R D
AsyASY FROMFromE-BOX E-Box
Cut CO2 Supply Line See CO2
PressureCUT CO2 SUPPLY Switch
LINE. SEE CO2 PRES URE SWITCH
InstallINSTALL DETAILDetail
Publication Number: 620919569 | - 2 - | © 2002, IMI Cornelius Inc. |