
ELEMENTS MEDIA TOWER
A
top and middle fixed shelves
NOTE: Make sure
arrows on each cam
points towards nearest edge with holes.
| C | left and right |
B bottom fixed | side panels | |
|
| |
shelf |
|
|
1A) Insert 4 wood dowels and 4 cams into top and middle shelves as shown. Make sure arrows on each cam points towards nearest edge with holes.
B) Insert 4 wood dowels and 4 cams into bottom fixed shelf as shown.
C)Insert 6 cam screws into left and right side panels as shown. Secure cam screws with a phillips head screwdriver.
top |
| left side |
fixed |
| panel |
shelf | middle |
|
| fixed | bottom |
| shelf | |
| fixed | |
|
| |
|
| shelf |
right side panel
2Fit dowels of fixed shelves into corresponding holes of left and right side panels. With a screwdriver, turn cams clockwise until it securely engages each cam screw.
back panel
3Attach 2 back panels to unit with 6 bolts per panel as shown. Secure bolts with an allen wrench.
Made in China - r05 | Customer Service 800.967.6696 www.crateandbarrel.com | Page 2 of 5 |