
TOTEM SHELVING
ASSEMBLY HARDWARE
Thank you for purchasing the Totem Shelving. This page lists all the contents included in the box. Please take the time to identify the hardware as well as the individual components to this product. As you unpack and prepare for assembly, place the contents on a carpeted or padded area to protect them from damage.
Note: 2 people are required to safely assemble this product.
26 - cam 26 - cams 4 - screws 26 - cam | 26 - wood | |
screws | covers | dowels |
WALL MOUNTING HARDWARE
2 - mounting | 1 - wall | 1 - wall |
plates | screw | strap |
Missing hardware?
Please call 800.606.6387 for replacements.
TOOLS REQUIRED
phillips head screwdriver
(We recommend the use of hand tools over power tools)
COMPONENTS
1 - top panel | 1 - bottom panel | 4 - side panels |
2 - back panels | 1 - back leg | 2 - side leg |
| panel | panels |
Made in China - r05 | Customer Service 800.967.6696 Latest instructions available at www.crateandbarrel.com | Page 1 of 4 |