2-Series Integrated Control Processor Crestron CP2/CP2E
Controls and Indicators
The CP2/CP2E front panel indicators and controls are described below.
PWR (Power)
This LED illuminates when the unit is connected to and receives 24VDC power from
an AC power pack or the Cresnet NET connector.
NET
This LED illuminates when the central processing unit is processing or
communicating with Cresnet devices (i.e., button pressed at Cresnet panel or data
received from Cresnet panel).
ERR
This LED illuminates when an error condition is detected. This may be the result of
hardware or software failure, or a programming error. To determine the actual error
condition, examine the message available through the Viewport menu Functions/2-
Series/errorlog.
LNK (LAN) – (CP2E only)
This LED illuminates when there is a connection to the rear panel LAN port.
ACT (LAN) – (CP2E only)
This LED illuminates when there is communication (activity) at the rear panel LAN
port.
HWR
Pressing this button initiates system hardware reset. (Same effect as disconnecting
and reconnecting power.)
SWR
Pressing this button in combination with the HWR button performs a system restart
without loading the program (refer to Troubleshooting Communications on page 22).
Pressing it alone while the system is running restarts the program.
Ports
The CP2/CP2E rear panel ports are illustrated and described below.
COMPUTER
COMPUTER
This DB9F connector is used when programming the units with a PC. The port is
modem compatible. The modem and/or PC program cable are not included.
NET
G Z Y 24
24VDC 24W
NET
4 2-Series Integrated Control Processor: CP2/CP2E Operations Guide - DOC. 5980