Dakota Digital LAT-NR340 installation instructions Minutes Before Going on

Models: LAT-NR340

1 3
Download 3 pages 55.55 Kb
Page 2
Image 2

5. Test fit the assembly into the tail light housing as shown below to make sure it aligns correctly.

6.Before mounting the new LED assembly into the housing, plug the bulb base into the stock bulb socket and test the tail lights and flashers to make sure everything is working correctly.

7.Make sure the tail light housings are clean and dry so the single use primer applicator can be used for both housings. Apply the primer to the outside edge of the housing where the tape will attach. AFTER THE PRIMER HAS BEEN APPLIED, LET THE HOUSING DRY FOR 5

MINUTES BEFORE GOING ON.

8.After the primer has had adequate time to dry, remove the backing from the tape located on the LED assembly.

MAN#650203

Page 2
Image 2
Dakota Digital LAT-NR340 installation instructions Minutes Before Going on