WALL MOUNT FULL BACKGUARD INSTALLATION
RECOMMENDED INSTALLATION ORDER:
1) VENT HOOD | 2) BACKGUARD SYSTEM | 3) COOKTOP |
1.Locate and level cooktop per installation instructions.
2.After unpacking all backguard system parts, locate the Back Section 1/4” (see fig. 09) above and centered over the Trim attached to the cooktop.* Secure Back Section to wall with the appropriate fasteners (not supplied) to anchors or wood stud (fig. 09).
WARNING:
The Back Section must be securely fastened to the wall. Failure to do so could cause damage or personal injury if the Backguard was to pull free from wall when racks are loaded. The maximum weight placed on each rack should be 10 lbs.
*After 1/4” is located, slots in back section may be used to adjust spacing between cooktop trim and backguard for a flush fit.
3.Attach rod, end caps and center stanchion to Front Section of backguard with #10 machine screws supplied (fig. 10).
4.Bend
5.Secure Front Section of backguard to the Back Section with #8
6.Attach racks to rod (fig. 12). The maximum weight placed on each rack should be 10 lbs.
9
US CA
BACKGUARDS FOR COOKTOPS - BGCU MODELS
Back Section
Slots to choose desired spacing between Cooktop Trim and Backguard.
1/4”
Trim
Fig.09
Bend down approx. 3/16” |
Front Section |
End |
Cap |
Center |
Stanchion |
#10 |
Machine |
Screws |
Rod |
End |
Cap |
Fig.10 |