UNPACKING
ASSEMBLY
(For 90,000 and 150,000 BTU/Hr Models Only)
1.Remove all packing items applied to heater for shipment.
2.Remove all items from carton.
3.Check items for any shipping damage. If heater is damaged, promptly inform dealer where you bought heater.
These models are furnished with wheels and handles. Wheels, handles, and the mounting hardware are found in the shipping carton.
Tools Needed
•Medium Phillips Screwdriver
•3/8" Open or Adjustable Wrench
•Hammer
1.Slide axle through wheel support frame. Install wheels on axle. IMPORTANT: When installing wheels, point extended hub of wheels toward wheel support frame (see Figure 4).
2.Place cap nuts on axle ends. Gently tap with hammer to secure.
3.Place heater on wheel support frame. Make sure air inlet end (rear) of heater is over wheels. Line up holes on fuel tank flange with holes on wheel support frame.
4.Place front handle and rear handle on top of fuel tank flange. Insert screws through handles, fuel tank flange, and wheel support frame. Attach nut finger tight after each screw is inserted.
5.After all screws are inserted, tighten nuts firmly.
Hot Air | Screw |
Outlet |
|
Fuel
Tank
Flange
Wheel
Support
Frame
WheelNut
Cap Nut
Front
Handle
Rear
Handle
Air
Inlet
Extended
Axle Hub
ASSEMBLY, EUROPFA/PV 018A
Figure 4 - Wheel and Handle Assembly, 90/150,000 BTU/Hr Models Only
5
099606