Desa BY150ECA owner manual Ventilation Operation, To Start Heater

Models: BY150ECA

1 24
Download 24 pages 59.88 Kb
Page 7
Image 7
VENTILATION

VENTILATION

OPERATION

!WARNING

Follow the minimum fresh, outside air ventilation requirements. If proper fresh, outside air ventilation is not provided, carbon monoxide poisoning can occur. Provide proper fresh, outside air ventilation before running heater.

Provide a fresh air opening of at least 2800 square cm (three square feet) for each 100,000 Btu/Hr rating. Provide extra fresh air if more heaters are being used.

Example: A 150,000 Btu/Hr heater requires one of the following:

a two-car garage door raised 15.24 cm (six inches)

a single-car garage door raised 22.86 cm (nine inches)

two, 76.20 cm (thirty-inch) windows raised 30.48 cm (twelve inches)

!WARNING

Review and understand the warnings in the Safety Informa- tion Section, pages 2 and 3. They are needed to safely operate this heater. Follow all local codes when using this heater.

To Start Heater

1.Follow all ventilation and safety information.

2.Fill fuel tank with kerosene or No. 1 fuel oil.

3.Attach fuel cap.

4.Plug power cord of heater into standard 120 volt/60 hertz, grounded (earthed) outlet. Use an extension cord if needed. Use only a three-prong, grounded (earthed) extension cord.

Extension Cord Wire Size Requirements

Up to 30.5 meters (100 feet) long, use 1.0 mm2 (16 AWG) conductor

30.6 to 61 meters (101 to 200 feet) long, use 1.5 mm2 (14 AWG) conductor

Heater will start when power cord is plugged into outlet. If not, push in flame- out control reset button (see Figure 5).

Flame-Out Control To Start Heater

Reset Button

Figure 5 - Flame-Out Control Reset Button

Continued

7

 

 

102424

Page 7
Image 7
Desa BY150ECA owner manual Ventilation Operation, To Start Heater