INSTALLATION

Checking Gas Connections (Cont.) Installing Logs, Models CGS2718P, CGS2718N, CGS3124P and CGS3124N

13

INSTALLATION

Continued

Pressure Testing Heater Gas Connections

1.Open equipment shutoff valve (see Figure 15).

2.Open main gas valve located on or near gas meter for natural gas or open propane/LP supply tank valve.

3.Make sure control knob of heater is in the OFF position.

4.Check all joints from gas meter (natural gas) or propane/LP supply to equipment shutoff valve (see Figure 16 or 17). Ap- ply a commercial leak detection solution to all joints. Bubbles forming show a leak.

5.Correct all leaks at once.

6.Light heater (see Operating Heater, pages 15 through 17 [manu- ally-controlled models] or pages 17 and 18 [thermostatically- controlled models]). Check all other internal joints for leaks.

7.Turn off heater (see To Turn Off Gas to Appliance, page 17 [manually-controlled models] or page 18 [thermostatically- controlled models]).

Open

Equipment

Shutoff

Valve

Closed

INSTALLING LOGS, MODELS CGS2718P, CGS2718N, CGS3124P AND CGS3124N

WARNING: Failure to position the parts in accor- dance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury.

CAUTION: After installation and periodically there- after, check to ensure that no flame comes in contact with any log. With the heater set to High, check to see if flames contact any log. If so, reposition logs ac- cording to the log installation instructions in this manual. Flames contacting logs will create soot.

Each log is marked with a number. These numbers will help you identify the log when installing. It is very important to install these logs exactly as instructed. Do not modify logs. Only use logs supplied with heater.

1.Locate pegs on the bottom of back log (#1). Slide these pegs into the holes in the grate base behind the burner (see Figure 18).

Back Log (#1)

Figure 15 - Equipment Shutoff Valve

Gas

Meter

Equipment Shutoff Valve

Control

 

 

Valve

Peg

 

Location

 

 

Peg

 

 

Hole

Figure 16 - Checking Gas Joints (Natural Gas Only)

Propane/LP Supply Tank

Equipment Shutoff Valve

Control

 

 

Valve

Figure 18 - Installing Back Log

 

Location

Figure 17 - Checking Gas Joints (Propane/LP Gas Only)

For morevisit www..com

107068-01D

Page 13
Image 13
Desa CGS3124P installation manual Pressure Testing Heater Gas Connections, Equipment Shutoff Valve