Desa (V)G36R, (V)G36HR Optional Gas Line Installation, Glass Door Installation

Models: (V)G36HR (V)G36H (V)G36R (V)G36

1 16
Download 16 pages 18.3 Kb
Page 11
Image 11
Glass Door

Optional Gas Line

Installation

Continued

Manual background CAUTION: All gas piping and connections must be tested for leaks after the installation is completed. After ensuring that the gas valve is on, apply soap and water solution to all connections and joints. Bubbles forming show a leak. Correct all leaks at once. DO NOT USE AN OPEN FLAME FOR LEAK TESTING AND DO NOT OPER- ATE ANYAPPLIANCE IF A LEAK IS DETECTED. LEAK TESTING SHOULD BE DONE BYA QUALI- FIED SERVICE PERSON.

Manual background WARNING: Do not oper- ate an unvented gas log set in this fireplace with the chimney removed.

If you install a decorative gas appliance (vented gas log), the decorative gas appliance must comply with the Standard for Decorative Gas Appliance for Installation in Solid Fuel Burning Fireplaces, ANS Z21.60, Z21.84 or RG 2-72and shall also be installed in accordance with the National Fuel Gas Code, ANSI 7223NFPA 54 latest edition.

Outside of

 

Side

Fireplace

 

Firebrick

Gas

Incoming

Finished

Side

Line

1/2" Black

 

Conduit

Iron Pipe

 

 

Seal

 

Repack

Opening

 

with

 

Insulation

Refractory

 

Cement

Provide Enough Threaded

End for Fitting Connection

Figure 19 - Gas Line Installation

Manual background WARNING: If the fireplace has been used for wood burning, the firebox and chimney must be cleaned of soot, creosote and ashes by a qualified chimney cleaner. Creosote will ignite if heavily heated.

Manual background WARNING: When using a decorative vented gas log, the damper must be removed or permanently locked in the fully open position and the glass doors must be in the fully open position.

Glass Door

Installation

IMPORTANT: Install glass door frame before installing glass door.

Installing Door Frames

1.Remove screws from smoke shelf (see Figure 20).

2.Mount top door frame and secure with screws removed in step 1.

3.Remove center brick by pulling ring handle (see Figure 21, page 12).

4.Remove ash box.

Top Door

Rail

Smoke Shelf

Figure 20 - Installing Top Door Frame

116010-01C

www.desatech.com

11

Page 11
Image 11
Desa (V)G36R, (V)G36HR installation manual Optional Gas Line Installation, Glass Door Installation