CONCERTOTM TOILET DIMENSIONS
MODEL 3210
Dimensions may vary
INSTALLATION INSTRUCTIONS
System Requirements:
•2 GPM (10.6 lpm) or larger water pump.
•
•
•12 VDC through
STEP 1: Carefully unpack the toilet bowl, rear access lid and floor flange adapter. CAUTION: HANDLE THE VITREOUS
CHINA TOILET AND ACCESS LID WITH CARE. SET THE LID IN AN AREA WHERE IT CANNOT BE BROKEN. PLACE LID ON TOILET ONLY AFTER TOILET INSTALLATION IS COMPLETE.
STEP 2: Position the china bowl in the space intended. Confirm that adequate clearance is available for using the flush handle and opening the seat and lid.
STEP 3: Mark the floor at the rear corners of the toilet bowl (fig. 1). Measure the distance between the two marks and divide by 2 to find the toilet centerline. Mark the floor at the rear wall for the centerline.
STEP 4: Place a carpenter’s square against the back wall, and draw a center line on the floor at least 14 inches (356 mm) long (fig. 2). Mark the centerline for the floor flange at
Fig. 1
Fig. 2
Fig. 3
3