QUICK SETUP GUIDE
Thank you for choosing the Dynex
Package contents | Tools you will need: | ||
A Wall plate (1) | • | Power drill | |
B TV bracket (1) | • 1/8 in. wood drill bit | ||
C Locking bar (1) | • ½ in. masonry drill bit | ||
M4 Bag | • | Phillips screwdriver | |
D M4 × 12 mm screws (4) | • | Level | |
E | M4 × 30 mm screws (4) | • | Socket wrench with |
F | M4 spacers (4) |
| 7/16 in. socket or |
G M4 washers (4) |
| adjustable wrench | |
Lag Bolt Bag | • | Pencil | |
H Concrete wall | • | Stud finder | |
| anchors (2) | • | Awl |
I | 1/4 in. × 2½ in. |
|
|
| lag bolts (2) |
|
|
M4 Bag
M4 × 12 mm
Lag Bolt Bag
M4 × 30 mm
M4
1/4 in. × 2½ in.
M4
1 Attach the TV bracket
NOTE: Make sure there will be enough space between the back of the TV and the wall to connect all your cables.
You can use the optional M4 spacers to provide additional space. Without spacers: Attach the TV bracket (B)
to the back of the TV using the M4 washers (G) and the M4 × 12 mm
screws (D). With spacers: Attach the TV bracket (B) to the back of the TV using the
M4 spacers (F), M4
washers (G), and M4 × 30 mm screws (E).
NOTE: You can mount the
TV vertically or at an angle (tilt mount). See Step 3 for more information.
2Install the wall plate
Option 1: Installing to a wood stud wall
1Locate the stud. Verify the center of the stud with an awl or thin nail or use an edge to edge stud finder.
2Level the wall plate (A) and mark the hole locations.
3Drill the pilot holes as illustrated.
4Align the wall plate with the pilot holes, insert the lag bolts (I) through the
holes in the wall plate, then tighten the lag bolts only until they are pulled firmly against the wall plate (A). DO NOT
CAUTION: Avoid potential injuries or property damage! Any material covering the wall must
not exceed 5/8 in. (16 mm).
2.5in.
(63.5mm)*
*Drill the pilot hole to a depth of 2.5 in. (63.5 mm)
Option 2: Installing to a concrete wall
1Level the wall plate (A) and mark the hole locations.
2Drill the pilot holes as illustrated.
3Insert the concrete wall anchors into the pilot holes and make sure that the anchors (H) are seated flush with the surface.
4Align the wall plate with the anchors, insert the lag bolts (I) through the holes in the wall plate, then tighten the lag bolts (I) only until they are
pulled firmly against the wall plate (A). DO NOT
CAUTION: Avoid potential injuries or property damage!
Any material covering the wall must not exceed 5/8 in. (16 mm).
CAUTION:To prevent property damage or personal injury, never drill into mortar between blocks.
5/8 in. (<16 mm)**
2.5 in.
(63.5 mm)*
*Drill the pilot hole to a depth of 2.5 in. (63.5 mm) **Maximum thickness of any material covering
the stud or concrete surface.