Beer Dispenser
Installation Guide
1
32
4
5
6
10
7
8
17
9
11
|
|
|
| 12 | 14 |
|
| 18 |
|
|
|
|
|
|
|
|
| ||||
|
|
|
| |||||||
Parts List |
| 13 | 15 |
|
|
|
|
| ||
|
|
|
|
|
| |||||
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
| |||
| 1. | Faucet Handle | 10. | American Sankey Keg Coupler | ||||||
2. | Faucet | 11. | Metal Keg Floor Support |
|
|
| ||||
3. | Beer Tower | 12. | Caster Washer (x2) |
|
|
| ||||
4. | Guard Rail | 13. | Casters (x4) |
|
|
| ||||
5. | Drip Tray | 14. | Neoprene Washer |
|
|
| ||||
6. | Regulator | 15. |
|
|
| |||||
7. | CO2 Tube | 16. | Wire Shelves (not shown) (x2) |
8.CO2 Cylinder (supplied empty) 17. Half Barrel Keg (not included)
9. Cylinder Holder18. Faucet Wrench
1 | Warning: CO2 can be dangerous! CO2 cylinders contain |
| handled improperly. Please handle with care. |
| Note: Included accessories may not be as pictured |
For assistance, please call:
866-319-5473
Thank you for purchasing the EdgeStar Beer Dispenser.
Are you ready to enjoy some draft beer now?
All you need is:
•Included components (pictured to the left)
•Wrench
•Flat head screwdriver
•Pair of pliers/clamp crimper
•Full keg of beer (1/2 barrel size or smaller [pictured to the left but not included]) Note: Any Coors Brand or Miller Rubber Sided kegs will not fit inside this unit.
•Also, fill the included CO2 tank with CO2 (Most beer keg providers can fill your CO2 tank) Notice: this manual is provided as a supplement to the owner’s manual. Please refer to the owner’s manual for a full discourse on installation, usage and maintenance.
Note: Parts listed throughout this installation guide are numbered according to the diagram parts list.
1 Install Caster Wheels
Make sure unit is empty (including white metal keg floor(11)). Carefully tip the beer dispenser on its side. Connect the casters(13) to the cabinet by screwing in each metal bracket into one of four caster holes (casters in the front of the cabinet require the washers(12)). Then carefully set the unit upright
Note: allow dispenser to stand in an upright position for 8 hours before turning on the power.
2 Remove Plug
Open the door, and with your hand push the top cabinet plug through the top of the cabinet. Use flat head screwdriver as a prying tool if necessary.
3a Install Tower
Now begin installing the tower(3). Unravel the beer line hose from the bottom of the tower, and feed the hex nut and beer line through the hole you uncovered in the top of the cabinet.
3b Secure Tower
Once you have fed all the line into the cabinet, you can now place the tower into the unit. Align the black plastic adapter on the bottom of the tower to the hole in the top of the cabinet. The adapter should mate securely with the hole. Then turn the adapter about 25° to lock it into place. The faucet connection for the tower should now face the front of the cabinet. If the tower is not facing the front of the cabinet, remove it and reinstall it from another position.
4 Install Railing
Take the railing(4) and slide its “feet” into the pilot holes in the top of the cabinet
Warning: This guide is provided for informational purposes only. If you have any questions about the installation of this appliance, feel free to contact EdgeStar service at 866.319.5473 or consult a qualified installer. Neither the manufacturer nor its distributors shall be liable for any incidental, consequential, indirect, special, or punitive damages of any nature, including without limitation, lost revenues or profits, or any other damage whether based in contract, tort, or otherwise.