Elkay HRC2-1C installation instructions

Models: HRC2-1C

1 2
Download 2 pages 46.19 Kb
Page 2
Image 2
12, 13, 14

ITEM

PART

DESCRIPTION

NO.

NO.

 

 

 

 

1

30040C

Cover - Electrical Box

2

30039C

Box - Electrical

3

31513C

Control - Cold

4

31341C

Motor - Fan

5

30824C

Fan - Blade

6

42677000

Fan - Bracket

7

111543043890

Nut - Hex #6-32

8

66266C

Condenser

9*

35786C

Compressor Service Pak

10

31038C

Overload/Relay

11

31797C

Cover - Relay

12

19037000

Clip - Compressor Mounting

13

101516143550

Stud

14

100806740570

Grommet

15

66200C

Drier

16

66540C

Evaporator - Assy

17

50930C

Bumper

18

23105C

Cabinet

19

27304C

Baseplate

20

23107C

Panel - Rear (Not Shown)

21

23108C

Panel - Front

22

23109C

Panel - Condenser Mounting

23

66529C

Heat Exchanger

 

 

 

*INCLUDES RELAY & OVERLOAD. IF UNDER WARRANTY, REPLACE WITH SAME COMPRESSOR USED IN ORIGINAL ASSEMBLY.

NOTE: All correspondence pertaining to any of the above water cooler or orders for repair MUST include model number and serial number of cooler, name and part number of replacement part.

HRC2-1C

INSTALLATION

1.It is important to insure proper ventilation. For remote installation a minimum clearance of 6 inches (152 mm) to the front must be maintained, 1 inch (25 mm) each side, 3 inches (76 mm) to the rear above the unit. Wall grille EG-1 or EG-2 to be used when unit is inserted into an enclosure. Install unit as close as possible to wall grille. A 6 inch (152 mm) clearance beyond the front of the wall grille is required for adequate air circulation.

2.When unit is installed in a kitchen cabinet, two air openings with a minimum of 40 square inches each (minimum of 75% open area) must be provided in the cabinet. One opening should be in the overhang of the toe space. The other opening near the top of the cabinet. The remote unit must be installed with a minimum of 3 inch clearance between the unit and the walls of the cabinet. In addition a minimum 2 inch clearance must be provided between the toe space air opening and front of remote unit.

3.Water inlet is 1/4" (6 mm) O.D. tube. Contractor to supply connections as required.

4.Connecting lines to be of copper, thoroughly flushed to remove all foreign matter before being connected to chiller. If flushing does not remove all particles, a water strainer should be installed in supply line.

5.Connect cooler to building supply line with a shut-off valve and install a union connection between the valve and chiller.

6.Electrical: Make sure power supply is identical in voltage, cycle, and phase to that specified on chiller serial plate. Never wire compressor directly to the power supply.

START-UP

1.Open supply line valve.

2.Purge air from all water lines by operating bubbler valve of fountain to which chiller is connected. Steady stream assures all air removed.

3.Rotate fan to insure proper clearance and free fan action.

4.Connect to electrical power.

TROUBLE SHOOTING & MAINTENANCE

Temperature Control: Factory set at 50°F (+/- 5°) under normal conditions. For colder water, adjust screw on item no. 3 CW.

Ventilation: Cabinet louvers and condenser fins should be periodically cleaned with brush, air hose or vacuum cleaner. Excess dirt or poor ventilation can cause no cold water and compressor cycling on the compressor overload prctector.

Lubrication: Motors are lifetime lubricated.

ACTUATION OF QUICK CONNECT WATER FITTINGS:

Chiller is provided with a lead-free plug which utilizes an o-ring water seal. To remove plug from chiller, relieve water pressure, pull the collar towards the fitting and pull the fitting off the tube. To install plug, push fitting straight onto tubing until it reaches a positive stop, approximately 3/4 in. (19mm).

 

8

 

1, 2

22

 

 

3

23

4, 5,

18

6, 7

 

 

15

21

10, 11

 

9

17

16

19

12, 13, 14

97385C (REV B - 3/00)

Page 2
Image 2
Elkay HRC2-1C installation instructions