TAG

37.50 ppm

-- Confirmation Required --

Do you really want to do this ??

Press "Yes" or "Back..."

YesBack...

F1

F2

F3

F4

F5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TAG

 

 

 

 

 

 

 

 

 

 

 

37.50 ppm

 

 

 

 

 

 

 

 

 

 

 

-- Calibration Procedure Status

--

 

 

 

 

 

 

 

 

 

 

 

Procedure status:

 

 

 

 

 

 

Purging1-Wait

 

 

 

 

 

 

 

 

Remaining procedure time:

 

 

 

 

 

 

4 s

 

 

 

 

 

 

 

 

Current/expected gas flow:

 

 

 

 

Spangas-1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Concentration in span gas units:

 

 

 

 

37.50 ppm

 

 

 

 

 

 

 

 

----------------------Last zero calibration:

 

Results ----------------------

 

 

Success

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Last span calibration:

 

 

 

 

 

 

 

 

Success

 

 

 

 

 

 

 

 

Last zero calibration was:

Mon 06-08-1998 09:21:34

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Last span calibration was:

Fri 05-29-1998 13:37:23

 

 

 

 

 

 

 

 

Successful zero+span calibrated ranges:

1+2+3+4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Measure

 

Cancel !

 

 

 

 

Back...

 

More...

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F1

 

F2

F3

 

F4

 

 

F5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TAG

 

 

 

 

 

 

 

 

 

43.57

 

 

 

 

 

 

 

 

 

 

 

-- Calibration Procedure Status

--

 

 

 

 

 

 

 

 

 

 

 

Procedure status:

 

 

 

 

 

 

Spanning-Wait

 

 

 

 

 

 

 

 

Remaining procedure time:

 

 

 

 

 

108 s

 

 

 

 

 

 

 

 

Current/expected gas flow:

 

 

 

 

Spangas-1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Concentration in span gas units:

 

 

 

 

43.57 ppm

 

 

 

 

 

 

 

 

----------------------Last zero calibration:

 

Results ----------------------

 

 

Success

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Last span calibration:

 

 

 

 

 

 

 

 

Success

 

 

 

 

 

 

 

 

Last zero calibration was:

Mon 06-08-1998 09:21:34

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Last span calibration was:

Fri 05-29-1998 13:37:23

 

 

 

 

 

 

 

 

Successful zero+span calibrated ranges:

1+2+3+4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Measure

 

Cancel !

 

 

 

 

Back...

 

More...

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F1

 

F2

F3

 

F4

 

 

F5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Confirm the order for span calibration

Press

F2

to start

the spanning immediately.

Option:

Press the F4 key if you want to cancel the order.

Notes:

·The display of this message depends on the setup in the expert configurations. (see 5.1.8 p. 5-49)

·The 3 following illustrations show the displays you can see after starting the spanning procedure.

Spanning:

1. Purging-Wait

Notes:

·The procedure time de- pends on the parameters entered for purge time (see 5.1.1 p. 5-9).

·The purge time must be long enough to get a stable signal before calibration.

·You can cancel the run- ning calibration procedure at any time with the F2 key.

Spanning:

2. Spanning-Wait

Note:

The procedure time depends on the parameters entered for stability time and averaging time.

(see 5.1.1 p.5-9)

4 - 44

NGA 2000

90003482(2) [NGA-e (MLT-Software 3.2.X)] 07/98