CAUTION: NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS ARE FULLY EXTENDED AND LOCKED INTO POSITION.

STEP 1: HEATER AS RECEIVED OUT OF BOX.BEFORE

STEP 2: LIFT OUTER SHELL STRAIGHT UP. CARE MUST BE

LIFTING OUTER SHELL PROTECT HANDS. NEVER

TAKEN TO PROTECT HANDS DURING LIFT.

GRASP BARE METAL WITHOUT HAND PROTECTION.

 

Make sure clip goes into

Lock shells together and

clips in place with screws

slot in lower shell.

in each clip. 3 Screws

3 Places

Total.

 

STEP 3: LIFT OUTER SHELL UNTIL ALL THREE CLIPS

STEP 4: LOCK THE CLIP INTO PLACE WITH 3 SCREWS AS

SHOWN. THE HEATER MUST NOT BE OPERATED UNLESS THE

INGAGE SLOTS IN LOWER SHELL. WHEN THIS HAPPENS,

OUTER SHELL IS PROPERLY EXTENDED AND FULLY LOCKED

THE SCREW HOLES WILL LINE UP.

INTO PLACE.

 

CAUTION: NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS ARE FULLY EXTENDED AND LOCKED INTO POSITION.

Enerco Group, Inc. Convection Construction Heater

5

Operating Instructions and Owner’s Manual

Page 5
Image 5
Enerco HS80CV, HS200CV manual Make sure clip goes into