CAUTION: NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS ARE FULLY EXTENDED AND LOCKED INTO POSITION.
STEP 1: HEATER AS RECEIVED OUT OF BOX.BEFORE | STEP 2: LIFT OUTER SHELL STRAIGHT UP. CARE MUST BE |
LIFTING OUTER SHELL PROTECT HANDS. NEVER | TAKEN TO PROTECT HANDS DURING LIFT. |
GRASP BARE METAL WITHOUT HAND PROTECTION. |
|
Make sure clip goes into | Lock shells together and | |
clips in place with screws | ||
slot in lower shell. | ||
in each clip. 3 Screws | ||
3 Places | ||
Total. | ||
|
STEP 3: LIFT OUTER SHELL UNTIL ALL THREE CLIPS | STEP 4: LOCK THE CLIP INTO PLACE WITH 3 SCREWS AS | |
SHOWN. THE HEATER MUST NOT BE OPERATED UNLESS THE | ||
INGAGE SLOTS IN LOWER SHELL. WHEN THIS HAPPENS, | ||
OUTER SHELL IS PROPERLY EXTENDED AND FULLY LOCKED | ||
THE SCREW HOLES WILL LINE UP. | ||
INTO PLACE. | ||
|
CAUTION: NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS ARE FULLY EXTENDED AND LOCKED INTO POSITION.
Enerco Group, Inc. Convection Construction Heater | 5 | Operating Instructions and Owner’s Manual |