Initial Installation

QUALIFIED INSTALLERS ONLY

CORNER INSTALLATIONS:

Do not interfere with the structural integrity of the walls.

Figure 13: Corner installation top vented.

VERTICAL INSTALLATION:

STEP 1. Check the instructions for required clearances (air spaces) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. Do not pack air spaces with insulation.

STEP 2. Set the gas appliance in the desired location.

 

Drop a plumb bob down from the ceiling to the

 

position of the appliance flue exit, and mark

 

the location where the vent will penetrate the

 

ceiling. Drill a small hole at this point. Next,

 

drop a plumb bob from the roof to the hole

 

previously drilled in the ceiling, mark the

 

spot where the vent will penetrate the roof.

 

Determine if ceiling joists, roof rafters, or

 

other framing will obstruct the venting system.

 

You may wish to relocate the appliance, or to

 

offset, to avoid cutting load bearing members.

 

STEP 3. To install the Round Support Box/Wall Thimble

 

in a flat ceiling, cut a 10 inch (25.4 cm) square

 

hole in the ceiling, centered in the hole drilled

 

in Step 2. Frame the hole as shown in Figure

 

14.

 

STEP 4. Assemble the desired lengths of black pipe and

Figure 14: Wall Framing for 10” (25.4 cm) x 10” (25.4

elbows necessary to reach from the appliance

cm) Hole for Vertical Installation.

adapter up through the Round Support Box.

 

Insure that all pipe and elbow connections are

 

in their fully twist-locked position.

 

12

Page 12
Image 12
Enviro EG40 DV, C-10365 owner manual Do not interfere with the structural integrity of the walls