Assembly
1
Central Park Storefront
Tabs | Tab |
|
Base | Slots | Slot |
|
| |
|
| Back View |
3
Base Hole Peg
Storage
Compartment
Playground Ramp
•Place the base on a flat surface, facing away from you.
•Fit the Central Park Storefront tabs into the slots in the base, as shown.
Small Tabs
2
Large
Tab
Front View
•Place your hand inside the clock tower on the Central Park Storefront, as shown.
•Slide the Central Park Storefront forward until all three tabs on the front side of the Central Park Storefront “snap” into the slots in the base (see inset illustration).
•Make sure the large tab (below the pet shop) and the two small tabs (below the fire station) on the
Central Park Storefornt are inserted into the slots |
|
in the base. | 4 |
|
•At an angle, insert the upper Playground Ramp peg into the hole inside the storage compartment.
•Push the ramp up as you “snap” the lower Playground Ramp peg into place.
Hint: The Playground Ramp rotates open for play or close it to store accessory pieces in the storage compartment.
4
Gas Station Ramp can be attached here.
Tabs | Tabs |
Slots
Slots
Base
Gas Station Ramp can be attached here.
•Insert the two tabs on the Gas Station Ramp into the two slots in the base near the Fire Station.
•You can also attach the Gas Station Ramp behind the Fire Station. Insert the two tabs on the Gas Station Ramp into the two slots in the base.
Hint: The Gas Station Ramp disassembles easily. Simply lift the tabs out of the slots for removal or