4
Beginning at the wide of the
spiral, “snap” the spiral onto the
posts on the quarry walls.
• First, “snap” the peg
on the outside of the
loader into the hole in
the quarry wall
A
.
AssemblyLOADER
• Then, “snap” the
handle base on the
loader into the groove
in the quarry wall
B
.
B
A
6
“Snap” the conveyer into the
rock base.
CONVEYER
ROCK BASE
SPIRAL
START
HERE
5