Fluke Operation, Symbols, PM8907/801 . PM8907/804, PM8907/806, PM8907/807 . PM8907/808

Models: PM8907

1 2
Download 2 pages 60.34 Kb
Page 2
Image 2
OPERATION

OPERATION

Please read these instructions carefully before using the Power Adapter/Battery Charger.

SYMBOLSWarning

To avoid electrical shock, connect the PM8907 Power Adapter to the AC outlet before connection to the ScopeMeter® test tool.

zThe Power Adapter/Battery Charger operates the ScopeMeter® test tool from the local line.

zThe Power Adapter/Battery Charger charges the internal Battery Pack of the test tool.

zObserve the polarity 5-mm power jack; the outer contact is plus (+) polarity.

zDo not open the PM8907, it is not serviceable.

SYMBOLS

International electrical symbols used are explained below.

See explanation on

Instruction Sheet

DOUBLE INSULATION (Protection Class)

Conformité Européenne

Do not dispose of this product as unsorted municipal waste. Go to Fluke's website for recycling information.

Figure 1. PM8907/801

Figure 2. PM8907/804

Figure 3. PM8907/806

Figure 4. PM8907/807

Figure 5. PM8907/808

Figure 6. PM8907/813

Caution

Before you connect the PM8907/808 to the local line, first check the preselected voltage setting on this unit. (see Figure 5.)

For connection to the mains outlet, use a power cord that complies with national standards.

Page 2
Image 2
Fluke specifications Operation, Symbols, PM8907/801 . PM8907/804, PM8907/806, PM8907/807 . PM8907/808, PM8907/813