Figure 20A - Installing Charred Log Top View
Figure 21A - Installing Middle Split Log Rear Top Side
View
6.Find the right split crossover log (D-022) The bottom of the log has a rectangular stand off that fits in the slots on the right side of the front right log and the middle split log. Place this log as shown in Figure 22.
Square Peg | Right Split Crossover |
|
| Log (D-022) |
Figure 20B - Installing Charred Log Top Side View
5.Find the middle split log (LMF42-SC: D-021 or LMF48-SC: D028). See Figures 21 and 21A. The split side of the log faces forward. The log has a notch that fits around the burner tube on the right side. The left side of the burner tube fits into the notch on the back side of this log. The log is placed properly when it sits parallel to the tube burner and the square peg is pointing up. See figures for reference.
Right Front Log
Figure 22 - Installing Right Split Crossover Log
7.Find the front top log (D-024). See Figure 23. The left end of this log has a square hole that fits over a square peg that is on the top of the middle split log. The right end of this log rests behind the knot on the top of the front right log.
Square Peg | | Right Split |
Front Top Log | |
(D-024) | Rectangular | Crossover |
| Log (D-022) |
| Peg |
| |
Middle Split Log | | | |
(D-021 or D028) | | Middle Split Log | |
Figure 21 - Installing Middle Split Log (D-021) | Figure 23 - Installing Front Top Log | |
125636-01A | www.fmiproducts.com | 13 |