Fireplace Assembly Procedures
TOOLS NEEDED FOR INSTALLATION:
One4ft.level•
Roto-hammerwith½”drillbit•
DrillmotorwithmixerbladetomixMortar•
Twoempty5gallonbucketstomixMortar•
Onewheelbarrow• andshoveltomixconcrete
Groutbag•
Triangularmasonrytrowel•
Rubberhammer•
Spongeand2waterbucketstowipedownandmoisten•
partspriortoapplyingmortar
MATERIALS NEEDED FOR INSTALLATION:
Epoxyforsecuringrebarinfooting/foundation•
Three(3)-90lb.bagsofreadymixconcretewith¼”or•
smalleraggregate
MATERIALS INCLUDED:
8-⅜”Rebarx28”Long•
8-⅜”Rebarx12”Long•
1-50lb.bucketMortar•
20-SmallWoodShims•
Note-Wipeexcesswaterfromsurfacepriortoapplyinggrout.
Thiswillhelpgrouttoadheretosurfaceduringassembly.
Warning:Allsurfaceswheregroutisappliedmust havewater
spongedonseveralminutespriortoassembly.Thiswillminimize
crackingofgroutjointandprovidemaximumstrength.
PlacetheGrandMeridianFireplacehearthbaseontopofyour
non-combustible oor. For concrete slabs, supporting oor
needstoberatedatASTM90.
Drawanoutlineofthehearth���areabasedonthedimensions1)
showninFigure 17.PositionHearthslabsandmarkrebar
centerlocations.Drill4inchesintoconcreteslabandsecure
the8piecesof12inchrebarwithepoxy. 
Figure 17 LeftSideHearth2nd
RightSideHearth1st
Model W
MM39VF 43”
MM44VF 48”
MM49VF 53”
W
28”
Applymortar
betweenjoints
12inchrebar
MixabatchofmortarandprepareRightSideHearthbottom2)
surfacetobebondedasshowninFigure 18. 
Figure 18
1/2”AWAY
FROMEDGES
1/2”MORTAR
BEADTYPICAL
Hearthsectionshownprepared
forRightSideposition
APPLYMORTAR
BEADTOALL
MATINGSURFACES
AlignRightSideHearthto theoutlinecreated.Theoverall3)
widthshouldallowforanapproximategapof1/8”between
slabsfortheadditionalmortar tounitetheremainingslab.
Checkforsurfaceatness,levelifnecessary.
ApplymortartotheremainingHearthexceptthistimeapply4)
beadingonsurface tobefacing oorasshown inFigure
19.
Figure 19 Hearthshownprepared
forLeftSideposition
Beforeinstalling��� side walls, conrm placement of outside5)
combustionair access (if required), this can be installed
eithersidedependingonwhichsideisaccessibletooutside
combustion air (all diagrams in this manual show the
combustionair inlet hole on the right side). Prepare side
wallandrearwallmatingsurfaceswiththepreparedmortar
andbeginassembly. 
Figure 20
SideWall shown prepared for Right Side Air
Access.ForLeftSidebeadoppositeside.
1/2”AWAY
FROMEDGES
Keeptheassemblyofthenextsections ofthereboxside6)
wallsmovingup,keepingcomponentsmoist,mixingmortar
asyouneed it and threading the mortar appropriately as
youstackeachsection,oneontothenext.Constantlycheck
forsquarenessandlevelnesswhilebuildingeachcourseof
block.Asyoucompleteeachsection,makecertainthatyou
adherethemortarateachandeveryjoint. 