Friedrich SH14, SH20 installation manual THROUGH-THE-WALL Installations, Wall Preparation

Models: SH14 SH20

1 60
Download 60 pages 10.39 Kb
Page 14
Image 14

SECTION V — SHELL INSTALLATION

(B) THROUGH–THE–WALL INSTALLATIONS

WALL PREPARATION:

The maximum wall thickness permissible without special construction is determined by the model size to be installed. THE

OUTSIDE CABINET CONDENSER AIR INTAKE LOUVERS MUST NOT BE BLOCKED BY EXTENDING INSIDE THE WALL AREA. Observe the maximum wall thickness shown as dimension "A" in Figure J.

SPECIAL INSTRUCTIONS FOR EXTRA THICK WALLS: For installation in walls exceeding the maximum thickness shown as dimension A, the following suggested construction may apply. (See Figure J).

FIGURE J

EXTRA THICK WALL CONSTRUCTION

15 1/8 " (384 mm) Maximum wall thickness

Condenser

Air intake

Louvers

Top view showing beveled sides for air intake. Wall below unit must also be beveled to assure proper tilt angle.

2" (51 mm) minimum Both sides

Condenser air

Intake louvers

STEP 1. CHECKING WIRING AND PLUMBING: Check all wiring and plumbing inside and outside the wall to be sure none will be broken where the hole is to be cut.

STEP 2. HOLE CONSTRUCTION: Depending on the size of the unit to be installed, layout the hole dimensions in accordance with the chart below (See Figure K). Cut and frame in the hole to the finished dimensions. Use 2" x 4" material for framing and follow the suggested typical installations in Figure L, M or N on Page 15.

NOTE: IF THE WALL CONSTRUCTION IS TYPICAL FRAME OR 2 X 4 STUDDING WITH BRICK OR STONE VENEERS, LOCATE THE HOLE NEXT TO ONE OF THE STUDS. FOR MASONRY, CONCRETE OR CINDER BLOCK WALLS, LOCATE THE HOLE FOR CONVENIENCE.

FIGURE K

HOLE SIZE REQUIREMENTS

 

 

 

 

 

 

 

FINISHED

SMALL

 

MEDIUM

 

DIMENSION

CHASSIS

 

CHASSIS

 

 

 

 

 

 

A

16-3/16"

 

18-3/16"

 

 

 

 

 

 

B

26-3/16"

 

26-3/16"

 

 

 

 

 

NOTE: THESE DIMENSIONS ARE FOR FINISHED HOLE SIZE

Page 14

Page 14
Image 14
Friedrich SH14, SH20 installation manual THROUGH-THE-WALL Installations, Wall Preparation