
Installation requirements
STEP 1 | The WSC SLEEVE should be positioned so that the | STEP 4 The WSC SLEEVE must also be installed with a downward | |
| DRAIN EXTENSION extends a minimum of 9⁄16" beyond | tilt toward the outside of the building. If a level is placed | |
| the OUTSIDE WALL (See Figure 8). | so that it rests on the FRONT and BACK UNIT REST as | |
STEP 2 | The WSC SLEEVE must extend a minimum of ⅞" beyond | shown in Figure 9, a properly installed unit provides a ½ | |
bubble slope to the outside of the building. | |||
| the INSIDE WALL. | CAUTION: SLEEVE projections and leveling precautions | |
STEP 3 | The WSC SLEEVE must be installed level side to side. | ||
must be observed to prevent the entry of water into the room. |
Figure 9
Raised Ledge | Back Unit Rest |
|
Level
Front Unit Rest
Sleeve installation
STEP 1 After unpacking the WSC SLEEVE from the carton, remove the corrugated FRONT PANEL. Place the WSC SLEEVE in the wall opening following the instructions given in the INSTALLATION REQUIREMENTS. Attach the SLEEVE to the INSIDE WALL by driving two #12A x 2" screws in each side of the SLEEVE (see Figure 8). Shim at the top of the SLEEVE, midway between the sides. Drive one #12A x 2" screw in the top of the sleeve, close to the shim. Install screws from inside the SLEEVE. If the wall opening is not framed with wood, use expansion anchor bolts or molly (toggle) bolts (not provided).
STEP 2 Once the SLEEVE has been installed, check the LEVEL again to be sure the ½ bubble downward tilt is maintained. Apply shims, if required, to maintain the proper slope.
STEP 3 Caulk the perimeter of the entire opening on the inside and the outside between the SLEEVE and the WALL.
STEP 4 The corrugated front panel removed in Step 1 above must be remounted back in place if masonry work is to be done and/or if the "WallMaster" CHASSIS is to be installed at a later date.
12