2
PRE-INSTALLATION REQUIREMENTS
Tools Required for Installation:
1. Phillips screwdriver
2. 10 mm socket with ratchet.
3. Channel-lock adjustable pliers.
4. Carpenter’s level.
ELECTRICAL REQUIREMENTS
CIRCUIT - Individual, properly polarized and grounded
15 amp. branch circuit fused with 15 amp. time delay
fuse or circuit breaker.
POWER SUPPLY - 2 wire, with ground, 120 volt, single
phase, 60 Hz, Alternating Current. NOTE: The use of this
washer with power created by gas powered generators, solar
powered generators, wind powered generators or any other
generator other than the local utility company is not
recommended.
OUTLET RECEPTACLE - Properly grounded 3-prong
receptacle to be located so the power supply cord is
accessible when the washer is in an installed position.