Fujitsu MB2142-03 manual Power-on Sequence

Models: MB2142-03

1 31
Download 31 pages 63.62 Kb
Page 25
Image 25
2.4 Power-on Sequence

2.4 Power-on Sequence

2.4Power-on Sequence

Before turning on the power, ensure that all connections are complete. Then, turn on the power in the order of the host machine, the main unit, then the target (user system).

Power-on Sequence

Before turning on the power, ensure that all connections are complete. Then, turn on the power in the order of the host machine, the main unit, then the target (user system).

To turn on the power, set the power switch on the rear panel of the main unit to "1". Turning on the main unit also turns on the parallel communications adapter.

17

Page 25
Image 25
Fujitsu MB2142-03 manual Power-on Sequence