Installation Checklist - GE Home Generator Systems
Proper installation of the home generator requires the completion of the following tasks:
Carbon Monoxide (CO) Detector/ Smoke Detector |
|
| |||
Carbon Monoxide (CO) detector(s) installed and in working | Operation | ||||
order. |
|
|
| ||
|
|
|
| ||
Smoke detector(s) installed and in working order. | Cold weather kit is installed in temperatures below XX°F | ||||
Placement |
|
|
| (5°C). See Cold Weather Kit. | |
|
|
| Correct battery type is installed and fully charged. See | ||
Required permits have been obtained. |
| ||||
| Final Installation Considerations. | ||||
Generator placed in an area free from Carbon Monoxide | |||||
Generator engine oil level is at full mark. See Final | |||||
(CO) buildup. See Placement of Standby Generator to | |||||
Installation Considerations. | |||||
Reduce the Risk of Carbon Monoxide Poisoning. | |||||
Circuit breaker is in the ON position. | |||||
Generator placed in an area compliant to NFPA 37. See | |||||
Utility was shut off to test the operation of generator and | |||||
Placement of Standby Generator to Reduce the Risk of | |||||
Fire. |
|
|
| transfer switch. Note any fault codes and make corrections | |
Generator placed in an area free from water damage. See | as required. | ||||
AC Voltage Output___________________________. | |||||
Other General Location Guidelines. |
| ||||
Generator placed in an area free from utility and other | Frequency Output___________________________. | ||||
home systems. See Other General Location Guidelines. |
| ||||
Generator placed in a debris free zone. See Other General |
| ||||
Location Guidelines. |
|
| REPRODUCTION | ||
Generator placed on flat ground with provisions for water | Owner Information | ||||
drainage.See Other General Location Guidelines. | Name:______________________________________________ | ||||
Fuel |
|
|
| Address: ___________________________________________ | |
Generator is connected to fuel source with steel flexible | ___________________________________________________ | ||||
fuel line, has no fuel leaks and conforms to local codes. See | |||||
The Gaseous Fuel System. |
|
| Unit Information | ||
Proper fuel pressure has been measured with all gas | |||||
| NOT |
| Generator Model:_____________________________________ | ||
appliances operating. See The Gaseous Fuel System. | |||||
Fuel system has been configured for the proper fuel | Generator Serial Number:______________________________ | ||||
supply: Natural gas (NG) or liquefied petroleum ( LP). See |
| ||||
Fuel Conversion. |
|
|
| nstalling Contractor Information | |
Fuel type: (circle one) | G | LP |
| Name:______________________________________________ | |
Fuel pipe size used: (circle one) | 3/4” 1” | Address: ___________________________________________ | |||
See NFPA 54. |
|
|
| ___________________________________________________ | |
Fuel pressure at fuel inlet port withforgenerator on and at | Phone/FAX:__________________________________________ | ||||
full load and all gas appliances turned on and operating | |||||
____________________. |
|
|
|
| |
Electrical |
|
|
| Electrician: __________________________________________ | |
Generator neutral is connected to Automatic Transfer | Signature:___________________________________________ | ||||
Switch. See Generator AC Connection System. |
| ||||
Generator is grounded. See Grounding the Generator and | Plumber: ___________________________________________ | ||||
NFPA 70,NEC. |
|
|
| Signature: _ _________________________________________ | |
Generator is connected to the transfer switch with the | |||||
Inspector Information | |||||
specified wiring. See Utility Circuit Connection and | |||||
Transfer Switch Communication. |
| Name:______________________________________________ | |||
Generator is connected to the transfer switch with the | Address:_ ___________________________________________ | ||||
specified wiring. #18AWG twisted pair wiring from the | ___________________________________________________ | ||||
generator control panel to the transfer switch is installed | |||||
Title:_______________________________________________ | |||||
in a separate conduit from high voltage wires unless | |||||
Inspection Date:______________________________________ | |||||
the insulation rating on all wiring is rated for 600V See | |||||
Transfer Switch Communication. |
|
| |||
Dipswitches in most transfer switches must be set to | This generator has been installed per the manufacturer’s | ||||
instructions: | |||||
correspond to the wattage of the generator. See Transfer | |||||
Installing Contractor Signature: _______________________________ | |||||
Switch Operator/Installation Manual. |
| ||||
| Date:_____________________________________________________ | ||||
|
|
|
|
9