BUILD AND INSTALL THE

ZONELINE BASE PLATFORM

1. Construct a 2314min. x 2314min. square platform.
NOTE: The platform must have a load-bearing
capacity of 175 lbs. minimum.
1
Installation Instructions
18

WALL PLENUM AND ARCHITECTURAL LOUVER INSTALLATION

• Install the appropriate wall plenum through the exterior wall in accordance with the Installation Instructions
provided with the plenum.
IMPORTANT: The wall plenum is not designed to carry structural loads.

Proper wall header construction is required. The plenum requires proper

flashing, shim and caulk for a weather resistant installation.

Properly square and
level plenum.
Proper header for
structural support.
Apply proper caulking
and flashing.
Architectural
Louver—RAVAL1
Exterior/Outside Wall
Case
Wall Plenum
RAVWP6 – 6D x 1934W x 32H
RAVWP8 – 8D x 1934W x 32H
RAVWP12 – 12D x 1934W x 32H
RAVWP15 – 15D x 1934W x 32H
2. Place the platform in the utility closet with the
following clearance between it and the interior
surface of the walls/door/panel:
4min. from front of the case – Unit to be
installed through FRONT of case
5min. from front of the case – Unit to be
installed through SIDE of case
3min. from two sides of the case
3. Align the platform with the opening of
the wall plenum and secure to the floor
using appropriate brackets and bolts.
2314min. 2314min.
8min.
for drain
access Cutout for drain
connection