GE Zenith Controls
71R-5000A
11/04
ZTSCT/ZBTSCT Series
Closed Transition Transfer
& Transfer Bypass - Isolation Switches
100-4000 Amps
Operation and Maintenance Manual
Contents
Main
Table of Contents
Page
Authorized Service
For GE parts and service, call: 773 299-6600
Introduction
Safety
Mounting
Equipment Inspection and Storage
Final Equipment Inspection
Installation
Power Connections
Engine Start
Power Connections: Screw Type Terminals for External Power Connections
GE Zenith Controls
E
CAUTIONS
Initial Energization
Page
Entelli-Switch 250 Controller
Entelli-Switch 250 Controller
Entelli-Switch 250 Controller
LCD & Keypad
* E *
Entelli-Switch 250
S1 OK 01: 50 FRI 31 MAY 2003
User Setting for Voltage & Frequency
Standard 3-Phase Sensing on 3 and 4 Pole Units Source 1
Source 2
Accessory Group Packages
**
Accessory Definitions
Page
R50
S5P
S12P
S13P
S14
How to Set the System Clock
How to Set the System Clock
Set System Clock, time and date
Setting the System Clock
CDT One Event Timer Exerciser
Load / No-Load
How to CONFIGURE (CFG) and Set (SET) the Timer Exerciser
Set (SET) the Exerciser:
How to Initiate CDT Exerciser and to start an exercise cycle every 1, 7, 14, or 28 days
CDP Clock Exerciser
Load / No-Load Clock Exerciser
How to Configure (CFG) the Exerciser
How to set (SET) the DAILY Exerciser
How to Bypass (Cancel) an exercise during an exercise cycle
Entelli-Switch 250 User Setup - CFG Menu
TM
Turn options ON or OFF via keypad through the CFG menu
1
Engine Start Relay (De-Energized)
Entelli-Switch 250 User Setup - SET Menu
TM
Change adjustable values through the SET menu.
1
Engine Start Relay (De-Energized)
Entelli-Switch 250 User Setup - System Info
TM
View System Data
1
Engine Start Relay (De-Energized)
Testing
Introduction
Test Options
ATS Testing
Open Transition
NOTICE
Emergency Service Procedure for Extended Parallel Time
ZTSCT Transfer Switch
ZBTSCT Transfer/Bypass Switch
Sequence of Operation
Open Transition
Timer Designations as they appear in the SET menu
Page
Bypass-Isolation Operation
100-400 AMP
600-1200 AMP
1600-4000 AMP
Controls Power Supply (CPS)
30 GE Zenith Controls
Relay/Transformer (R/T Box)
Closed Transition CPS Schematic
Figure 16
Troubleshooting and Diagnostics
Table 4
Symptom Annunciation Possible Cause(s) Corrective Action
General Troubleshooting
NOTE: When you use the troubleshooting charts,
Maintenance and Testing
Inspection and Cleaning
Servicing
Testing
Page