Standby Generator Sets

Service Schedule

Maintenance

Level 1

 

Level 2

 

Level 3

 

Level 4

 

Level5

 

Tasks

Recom-

Task

Required

Task

Required

Task

 

Task

Required

Task

 

mended

Comp.

to be done

Comp.

to be done

Comp.

Required

Comp.

to be done

Comp.

 

to be done

(Date-

3 months/

(Date-

Semi-

(Date-

to be done

(Date-

Bi-

(Date-

 

monthly/

Initials)

Break-in

Initials)

annually/

Initials)

Annually/

Initials)

annually/

Initials)

 

10 hrs.

 

30 hrs.

 

50 hrs.

 

100 hrs.

 

250 hrs.

 

1.Disable the unit from operating

per the first page warning.

2.Check the engine

oil level. Adjust as necessary.

3.Check the engine coolant level. Adjust as necessary.

4.Check the engine coolant thermal

protection level. Correct as necessary.

5.Check the natural gas delivery system for leaks

and correct pressure on gas engine driven units. Tighten connections as necessary.

6.Check the air inlets and outlets for debris. Clean as necessary.

7.Check the battery electrolyte level and specific gravity if accessible. Adjust as necessary.

8.Check the battery

posts, cables, and charger for loose connections, corrosion, and proper operation. Correct as necessary.

9.Check the unit wiring for loose connections, corrosion, and damage. Correct as necessary.

09/05 A .Rev SrvSchd001

11-2

Page 21
Image 21
Generac 005262-0 owner manual Maintenance Level