Standby Generator Sets
Service Schedule
Maintenance | Level 1 |
| Level 2 |
| Level 3 |
| Level 4 |
|
Tasks | Recom- | Task | Required | Task | Required | Task |
| Task |
| mended | Comp. | to be done | Comp. | to be done | Comp. | Required | Comp. |
| to be done | (Date- | 3 months/ | (Date- | Semi- | (Date- | to be done | (Date- |
| monthly | Initials) | Initials) | annually | Initials) | Annually | Initials) |
13.Initiate an automatic start and transfer of the unit to
site load and exercise it for at least 1 hour looking for leaks, loose connections or components, and abnormal operating conditions. Correct as necessary.
14.Start and exercise the unit at full rated load (use a
load bank if the site load is not enough) for at least 2 hours looking for leaks, loose connections or components, and abnormal operating conditions. Correct as necessary.
15. Change the engine oil.
16.Replace the engine oil filter(s).
17.Replace the engine air filter(s).
18.Replace the engine fuel filter(s) on diesel engine driven units and
19.Check the engine spark plugs on gas engine driven units. Clean and
20.Perform a 5 minute
21.Return the unit to standby
setup for operation when required.
09/05 A .Rev SrvSchd002