How Much Power Do You Need?
Whole-House Protection
Generac offers
To accurately size
Sizing Guide
Air Cooled Generator | 8 kW | 10 kW | 14 kW | 17 kW | Circuits | 20 kW |
|
| | | (50 Amp / 240V)2 |
| |
|
| | | (40 Amp / 240V)2 |
| |
• | |
|
| (30 Amp / 240V)2 |
| |
Well Pump or Water Heater |
| | | | (20 Amp / 240V)2 |
|
Family Room |
| |
| | (20 Amp / 120V) |
|
Master Bedroom | | | | | (20 Amp / 120V) | Whole- |
Home Office |
|
| | | (20 Amp / 120V) | |
|
|
| ||||
Media Room |
| |
|
| (20 Amp / 120V) | house |
Garage |
|
| | | (20 Amp / 120V) | |
Bathroom | | | | | (15 Amp / 120V) | Protection |
Kitchen (#1)3 |
|
| | | (20 Amp / 120V) |
|
Kitchen (#2)3 | | | |
| (15 Amp / 120V) |
|
|
|
|
|
|
|
|
Furnace | | | | | (15 Amp / 120V) |
|
Sump Pump | |
|
| | (15 Amp / 120V) |
|
Bedroom (#2) | |
| | | (15 Amp / 120V) |
|
Bedroom (#3) |
|
|
|
| (15 Amp / 120V) |
|
|
|
|
|
|
|
|
Bathroom (#2) |
|
|
| | (15 Amp / 120V) |
|
1Check your air conditioner’s starting requirements. Starting requirements for older and/or less efficient equipment may exceed recommended generator capability. Additionally, for any electrical equipment or appliances, always check the manufacturer’s power requirements. This will help to ensure standby power accommodations for items that cycle during operation.
2 240 volt appliances require 2 circuits 3 Most kitchens require multiple circuits
•For smaller central air up to 2 tons
Note: Rooms and appliances indicated here are for example only. You may choose others that better reflect your needs. Because of the cycling nature of some appliances such as refrigerators and furnaces, it may not be possible for all appliances to run simultaneously.
Transfer switch configurations
Automatic Transfer Switch Basic
RTS-E models
RTS-S models
RTS-N models
Automatic Transfer Switch Basic is rated NEMA 1. All
Note: Warranty coverage is not available for generators that are used for prime power (main power source) in place of the existing utility power where utility power is present or in place of utility power where utility power service does not normally exist. For life support or critical care applications, please see page 6 for industrial units.
3