Graham Field AQ1000/AQ2000 user manual Unpacking, Pump And Bubble Pad Installation

Models: AQ1000/AQ2000

1 16
Download 16 pages 37.33 Kb
Page 9
Image 9
INSTALLATION

INSTALLATION

UNPACKING

1.Before unpacking, check for obvious damage to the carton or its contents. If damage is evident, please notify the carrier and your Graham-Field equipment provider.

2.Remove all loose packing from the carton.

3.Carefully remove all components from the carton.

4.Inspect all components. If damage is evident, please notify the carrier and your Graham-Field equipment provider.

PUMP AND BUBBLE PAD INSTALLATION

1.Remove all sheets, blankets, and pillows from the bed.

2.Place the bubble pad on the bed mattress with the tubing at the patient's feet.

UNPACKINGwire hanger

PUMP AND BUBBLE PAD INSTALLATIONfoot end

bubble pad

 

mattress

pump

 

 

(AQ2000 shown)

installation

3.Fold open the wire hangers on the back of the pump as shown above.

4.Use the hangers to hang the pump on the bed's foot end, as shown above; adjust the hangers to place the pump in the most upright position (or place the pump on a flat surface easily accessible to the caregiver and/ or doctor).

sNOTICE: Place the device in a position where the caregiver and/or doctor can access it easily.

AQ1000-INS-LAB-RevC11

9

Page 9
Image 9
Graham Field AQ1000/AQ2000 user manual Unpacking, Pump And Bubble Pad Installation