OPERATIONS

Loading

When replacing nails in your Model H6146, follow these guidelines:

Diameter: 764"-18"

Length: 2"-312"

Capacity: 100

Strip Angle: 34°

To load your nailer:

1.DISCONNECT NAILER FROM THE AIR SUPPLY!

2.Grip the nailer firmly, pull the maga- zine pusher back, and engage the catch lever as shown in Figure 3.

Pusher

Catch Lever

Figure 3. Sliding pusher toward the

catch lever.

3.Insert a strip of nails, pointed-end down, into the magazine as shown in Figure 4.

Figure 4. Loading nails into magazine.

4.Slide the nails all the way down to the nose of the nailer.

5.Release the catch lever. The pusher slides forward until it rests against the nail stick.

Operating

If you have not read the safety instruc- tions in this manual, do not operate the nailer.

Before you operate your nailer, place five to six drops of the included oil into the quick connect fitting where the nailer con- nects to the air supply.

To operate your nailer:

1.Connect the air supply to the quick connect fitting.

2.To test for proper nail penetration, hold the nailer perpendicular to the surface of a piece of clean scrap wood that is thick enough for the length of nails you have loaded.

-8-

H6146 34° Clipped Head Framing Nailer

Page 10
Image 10
Grizzly H6146 instruction manual Operations, Loading, Operating