Haier hc125fvs Installing Your Beverage Center, Unpacking Your Beverage Center, English

Models: hc125fvs

1 48
Download 48 pages 4.31 Kb
Page 6
Image 6
Installing Your Beverage Center

English

Installing Your Beverage Center

Unpacking Your Beverage Center

1.Remove all packaging material. This includes the foam base and all adhesive tape holding the beverage center accessories inside and outside.

2.Inspect and remove any remains of packing, tape or printed materials before powering on the beverage center.

Leveling Your Beverage Center

Your beverage center has leveling legs which are located at the bottom of your beverage center. After properly placing your beverage center in its final position, you can level your beverage center.

Leveling legs can be adjusted by turning them clockwise to raise your beverage center or by turning them counterclockwise to lower your beverage center. The beverage center door will close easier when the leveling legs are extended.

Also, there is an adjustable support for the lower door hinge. (see fig.4) After leveling the Beverage Center, adjust the hinge support, up or down as needed until it rests on the surface on which that unit is placed.

Proper Air Circulation

To assure your beverage center works at the maximum efficiency it was designed for, you should install it in a location where there is proper air circulation and electrical connections.

The following are recommended clearances around the beverage center:

Sides……………3/4 "(19mm) Top....................2" (50mm) Back..................2" (50mm)

5

Page 6
Image 6
Haier hc125fvs Installing Your Beverage Center, Unpacking Your Beverage Center, Leveling Your Beverage Center, English