Warning:The warnings, cautions, and instructions discussed in this instruction manual cannot cover all possible conditions and situations that may occur. It must be under- stood by the operator that common sense and caution are factors which cannot be built into this product, but must be supplied by the operator.

Unpacking

When unpacking, check to make sure the parts listed on page 6 are included. If any parts are missing or broken, please call Harbor Freight Tools at the number on the cover of this manual as soon as possible.

Operation

1/4” - 18 NPT

Rachet

Wrench

For best service you should incorporate an oiler, regulator, and inline filter, as shown in the diagram above. Hoses, couplers, oilers, regulators, and filters are all available at Harbor Freight Tools.

1. You will need to prepare the included 1/4” air connector to connect to the Air

Inlet (#2). First, wrap the 1/4” air connector with pipe thread seal tape before connecting to a Air Source Hose (not included).

2. Attach air hose to the Air Inlet (#2) on the Rachet Wrench.

Note: If you are not using an automatic oiler system, before operation, add a few drops of Pneumatic Tool Oil to the airline connection. Add a few drops more after each hour of continual use.

3.Set the air pressure on your compressor to 90 PSI. Do not exceed the recommended air pressure of 90 PSI.

4.Check the air connection for leaks.

SKU 47706

Page 4

REV 06/06

Page 4
Image 4
Harbor Freight Tools 47706 operating instructions Unpacking, Operation