2.Connect
3.Drape Tarp (7) over assembled frame and secure the corners (first) onto the frame using the Ball Tie Downs (4) as shown in 4A, B, and C, below.
4.Once the corners are fastened, place the Ball Tie Downs through the balance of the metal eyelets as shown in the previous illustration, 4D.
5.Lift one side of the roof and slide in four Steel Tubes (1). Line up the holes in the Tubes with the holes in the Fittings and insert
complete, do the same to the other side. See illustration to the right.
6.Insert the Nylon Base (5) onto each vertical leg.
7.Secure each Nylon Base to the ground
| Nylon Base (5) fits here. |
|
|
| REV 09e |
SKU 92928 | For technical questions, please call | Page 4 |