one on each side, and six Nuts (5). Hand tighten the Nuts (5) initially (see Fig- ures 1 and 2).

Flat Washer

Nut

 

Bolt

Upright Post

Safety Pin

 

Long Rod

 

Note:

Figure 2

 

Foot Plate at

Short Rod

base of uprights

 

 

must rest on the

 

 

floor.

 

3.Repeat step 1 to assemble the second Upright Post set.

4.Using two persons, stand up the two Upright Post assemblies in position and at- tach one Cross Beam (6) into the second Slot from the bottom of the two Upright Posts. These Cross Beams (6) have two metal Tabs on each end which slip into the Slots of the Upright Posts (2). Make sure the Flange on the Cross Beam (6) is facing up. This Flange will hold the Steel Shelves (7) in place (See Figure 1).

5.Repeat step 4 with a Cross Beam (6) on opposite side of Upright Post assembly.

6.Only one person is needed to finish the assembly. Continue to attach Cross

Beams (6) (Flanges pointing upward) at desired heights. The Cross Beams (6) on the top level must be positioned at the top Slot of the Upright Posts (2). Make sure each Cross Beam (6) is located in same Slots as the Cross Beam directly opposite its height on the Upright Post (2). This is to ensure that wneh the shelves are inserted, they will lay flat.

7.Use a rubber mallet (not supplied) to drive the Wedge at both edges of the Cross Beams (6) into the Slots on the Upright Posts (2) as deep as possible. Strike the Cross Beam (6) with the mallet as close to the Upright Post (2) as you can.

SKU 97563

For technical questions, please call 1-800-444-3353.

Page

Page 5
Image 5
Harbor Freight Tools 97563 manual Foot Plate at