Contents
Main
Hitachi Universal Storage Platform VM
Installation Planning Guide
F
L
Page
Contents
Installation Requirements...................................................................... 2-1
Page
Preface
Safety and Environmental Notices
Federal Communications Commission (FCC) Statement
Intended Audience
Product Version
Document Revision Level
Changes in this Revision
Document Organization
Document Conventions
Convention for Storage Capacity Values
Getting Help
Comments
Page
Planning for Installation
Responsibilities
Customer Responsibilities
Hitachi Data Systems Responsibilities
Installation Planning Tasks
Installation Planning Checklist
Installation Planning Checklist
Page
Installation Requirements
Safety Requirements
Delivery Requirements
Weight: The floors, elevators, stairs, and ramps must be able to support
Storage Requirements
Table 2-1 Environmental Specifications for Storage
Facilities Requirements
Physical Specifications and Requirements
Figure 2-1 Physical Overview of the Universal Storage Platform VM
2-6 Installation Requirements Hitachi Universal Storage Platform VM Installation Planning Guide
Dimensions and Weight
Figure 2-3 Physical Dimensions: Twin-Rack Configuration
Table 2-2 Component Specifications: Weight and Dimension
Installation Requirements 2-9 Hitachi Universal Storage Platform VM Installation Planning Guide
Service Clearance, Floor Cutout, and Floor Load Rating
Table 2-3 Floor Load Rating and Clearances: Single Rack
Table 2-4 Floor Load Rating and Clearances: Two Racks
Front
DKC615
Floor cutout area for cables Caste
G
Front
DKC615
Power Specifications and Requirements
Power Specifications and Power Supplies
Table 2-5 Current Specifications
Figure 2-6 Power Supply Locations
2-14 Installation Requirements Hitachi Universal Storage Platform VM Installation Planning Guide
Breaker Configurations
DKU-R2
Configuration with two disk chassis (DKC-F615I-B2) installed
Configuration with one disk chassis (DKC-F615I-B2) installed
Configuration with one disk chassis (DKC-F615I-B2) installed
Power Connection
Figure 2-9 Direct Power Connection
DKC
For the AC input power, connect one of the duplexes PDUs to the UPS and the other one to the PDP.
Figure 2-10 Power Connection through UPS
Installation Requirements 2-17 Hitachi Universal Storage Platform VM Installation Planning Guide
Input Voltage and Input Frequency
Table 2-6 Input Voltage and Input Frequency Requirements
Circuit Breakers and Plugs
Environmental Specifications and Requirements
Temperature, Humidity, and Altitude
Table 2-7 Environmental Specifications
Heat Output, Power Consumption, and Air Flow
Table 2-8 Component Specifications: Heat Output, Power Consumption, and Air Flow
2-20 Installation Requirements Hitachi Universal Storage Platform VM Installation Planning Guide
Loudness
Vibration and Shock
Table 2-9 Vibration and Shock Tolerances
Operational Requirements
Table 2-10 FED Cable Length Requirements
A
Units and Unit Conversions
Table A-1 Conversions for Metric and Standard (U.S.) Units of Measure
Page
Acronyms and Abbreviations
Page
Page
MK-97RD6679-00