F114 AND F115 CEILING SURFACE MOUNTED MEDIA AIR CLEANERS

MEDIA AIR￿

CLEANER 1

AIR SPACE￿

TO BE￿

CLEANED

1 DISCHARGE AIR FLOW IN ANY DIRECTION IS ACCEPTABLE.

M11694

 

Fig. 3. Choose location for air cleaners.

 

When selecting a location, make sure the air

CAUTION

IMPORTANT

 

 

cleaner is secured to ceiling load-bearing supports

Electrical Shock Hazard.

 

or joists. If installing on a T-grid drop ceiling, secure

Power source can shock.

 

the air cleaner to the true ceiling.

• Do not connect the power source until after the air

INSTALLATION

cleaner is mounted. This will prevent electrical

• Be sure to turn off the air cleaner before servicing

 

 

shock or equipment damage.

When Installing this Product…

it.

• If the air cleaner must be turned on for an

 

 

electrical check, be extremely cautious.

1. Read these instructions carefully. Failure to follow

• Be cautious when working near the moving parts

of the air cleaner.

 

them could damage the product or cause a hazardous

 

condition.

Mount and Wire the Air Cleaner

2.

Check the ratings given in the instructions and on the

 

product to make sure the product is suitable for your

 

 

application.

CAUTION

3.

Installer must be a trained, experienced service

 

technician.

Eye Exposure.

4.

After installation is complete, check out product

Harmful dust can obstruct or injure unshielded

 

operation as provided in these instructions.

eyes.

A CPZ™ module usually releases dust when it is handled.

Always wear safety glasses when installing or removing CPZ™ canisters.

68-0201-2 Revised 11-07

4

Page 4
Image 4
Honeywell F115 specifications Installation