69-1730 4
Step 1. Prepare for Installation (Cont)
2. Check that you have everything required for the
installation:
Two AA alkaline batteries
No. 2 Phillips screwdriver and standard pocket
screwdriver
•Drill
Drill bit—use 3/16 in. for drywall; use 7/32 in. for
plaster
Level (optional)
• Hammer
• Pencil
Electrical tape
69-1730.fm Page 4 Tuesday, July 13, 2004 12:45 PM