Hotpoint FZA34 manual Levelling, Fitting a Freezer under a Work Top, Installation

Models: FZA34

1 20
Download 20 pages 61.67 Kb
Page 4
Image 4

Installation

SAFETY &

INSTALLATION

 

 

Levelling:

Level the freezer when it is in its final location by adjusting the front feet, until firm contact is made with the floor. This will stop rocking or vibration and keep the door aligned which helps the freezer run reliably and efficiently.

Note: Before plugging in and switching on, leave the freezer standing in its final location for at least 15 minutes to allow it to settle.

Fitting a Freezer under a Work Top

To minimise running costs Hotpoint recommend fitting a vent to the rear of your worktop, which is available from Hotpoint Genuine Parts & Accessories Mail Order Hotline (see KEY CONTACTS, back page).

WARNING: If there is less than 30mm (11/4 inches) clearance above the freezer, a Vent must be fitted to provide adequate ventilation above your freezer.

4

Page 4
Image 4
Hotpoint FZA34 manual Levelling, Fitting a Freezer under a Work Top, Installation