Working Instruction

Document No. : SOP VV10 FA

 

 

Station :

1(1/1)

Name

: Disassemble Battery

Ver. :

0.20

Date :

2010/03/08

 

STEP:

1. Disassemble Battery (Fig.1)。

Fig.1

Point for attention:If finding some defects, notice the gaffer and assistant

Fixture list(Fixture standard)

Qty

Fixture list(Fixture standard)

Qty

 

 

 

 

Notebook

1

 

 

Scanner

1

 

 

Bar code printer

1

 

 

 

 

 

 

Tabulator:_Zhang Ying_

Issuing department: IE

Page 4
Image 4
HP 620 manual Working Instruction