Planning

Planning

Infrastructure Requirements

Infrastructure Requirements

Air conditioning. Power supplies create a great amount of heat. Ensure you have enough cool air to maintain an ambient temperature between 0°C to 55°C (32°F to 131°F) around the switch devices inside the rack.

Power requirements.Ensure you have enough power supplied to the area where the switches will be mounted. Some units have dual power supplies in them that you may want to consider connecting each power supply to different circuits.

Space. These devices may be deeper than other equipment in your network. Have enough space for the switch and around the switch to allow access and cool air circulation. If placing in an enclosed rack make certain there is adequate airflow and cooling through the rack.

Racks. These devices may be heavier than other devices in your network. Rack heavy devices at the bottom of the rack, followed by lighter devices as you move up the rack. Secure racks as specified by your rack’s manufacturer. Ensure your racks are compliant with any earthquake rules.

3-10