3.Configure the recovery cluster at the third datacenter.
4.Configure RAID Manager in the primary and recovery clusters.
5.Create Device Group pairs.
6.Assign Remote Command Device to Journal Volumes.
7.Configure LVM Volume Groups.
8.Configure VxVM disk groups.
9.Install and configure the application in the primary cluster.
10.Configure a primary package in the primary cluster using the 3DC modules.
11.Start the primary packages in the primary cluster.
12.Install and configure the application in the recovery cluster.
13.Configure a recovery package in the recovery cluster using the 3DC modules.
14.Configure Continentalclusters and Continentalclusters Recovery Group.
NOTE: This section provides information about configuring a
Install the required software on all nodes in the 3DC DR Solution
To configure an application in the 3DC environment, all the required software products and related patches must be installed. Install these software products and patches on all nodes in the 3DC DR Solution.
For information about softwares required and supported versions, see Serviceguard Disaster Recovery Products Compatibility and Feature Matrix (Metrocluster with Continuous Access for P9000 and XP) available at
Configuring the Primary Cluster
Create a Serviceguard cluster (Metrocluster) using the nodes in Site 1 and Site 2 using the procedure described in the Managing Serviceguard manual available at http://www.hp.com/go/
Configuring the Recovery Cluster
Create another Serviceguard cluster in Site 3 using the procedure described in the Managing Serviceguard manual available at
Configuring RAID Manager in the Primary and Recovery Cluster
The P9000 or XP RAID Manager
Use the following steps to create the RAID manager configuration:
1.Edit the /etc/services file and add an entry for the Raid Manager instance that has to be used with the cluster. The format of the entry is:
Example:
430 Designing a Three Data Center Disaster Recovery Solution