Hubbell Electric Heater Company V20, V10 manual Final Checks

Models: V20 V10

1 27
Download 27 pages 61.03 Kb
Page 12
Image 12
FINAL CHECKS

FINAL CHECKS

1.Check all connections for tightness.

2.Ensure that all the above steps are completed

3.After the water is heated for the first time, monitor the water temperature as described in Section III, Quarterly Inspection.

Outgoing Hot Water Manual background

Incoming Cold Water

1 – V Model Water Heater

2 – Pressure and Temperature Relief Valve (pipe overflow to floor drain or sink) 3 – Drain Valve

4 – Pressure/Temperature Gauge

5 – Shut-Off Valve

6 – Union

12

Page 12
Image 12
Hubbell Electric Heater Company V20, V10 manual Final Checks